Tuesday 2nd October 2018

[DC5-A] RPN switch maintenance on racks D1 / D2, scheduled 2 months ago

Following a bug identified on a specific switch, we are scheduling a maintenance on it on October 4th.
This switch is in charge of the RPN network on 2 different racks : D1 and D2.

Impacted racks : RPN network on D1 / D2 in DC5-A
Start time : Between 04/10/18 0700Z (0900LT) and 0730Z (0930LT)
Expected downtime : 20 minutes

We will update this status when the maintenance starts.

UPDATE: The maintenance has now ended. 0725Z (0925LT)